Sheldon Road_SR 99 Interchange Improvement
Environmental Documents
Technical Studies Prepared for the Recirculated Draft EIR_EA
Recirculated Draft EIR_EA - December 2004
Final EIR_EA – July 2005
Resource Agency Documents and Permits
Environmental Documents
Technical Studies Prepared for the Recirculated Draft EIR_EA
Air Quality Report – April 2004
Biological Resources Report – Natural Environment Study – April 2004
Cultural Resources - Historic Properties Survey Report - 2004
Hazardous Materials Report – Phase I Initial Site Assessment – July 2004
Noise Report – April 2004
Preliminary Drainage Report – April 2004
Relocation Impact Report – March 2003
Traffic Report – November 2003
Recirculated Draft EIR_EA - December 2004
0.0 Cover
0.1 Signature Page
0.2 Table of Contents
0.3 General Information About this Document
0.4 Executive Summary
1.0 Proposed Project
2.0 Affected Environment
2.1.1 Land Use
2.1.2 Growth
2.1.3 Community Impacts
2.1.4 Utilities & Emergency Services
2.1.5 Traffic
2.1.6 Cultural Resources
2.2.1 Hydrology and Floodplain
2.2.2 Water Quality and Stormwater Runoff
2.2.3 Geological and Soil Resources
2.2.4 Hazardous Materials
2.2.5 Air Quality
2.2.6 Noise
2.3.1 Natural Communities
2.3.2 Wetlands and Other Waters
2.3.3 Plant Species
2.3.4 Animal Species
2.3.5 Threatened and Endangered Species
2.3.6 Invasive Species
3.0 Cumulative Impacts
4.0 Comments and Coordination
5.0 Preparers and References
6.0 List of Technical Studies
Appendices
Appendix A - Notice of Preparation and Initial Study
Appendix B - Title VI Policy Statement
Appendix C - Summary of Relocation Benefits
Appendix D - Glossary of Technical Terms
Appendix E - List of Acronyms
Appendix F - Mitigation Summary
Appendix G - List of Projects Within City of Elk Grove
Appendix H - Elk Grove community Services District Letter
Complete Sheldon Road_SR 99 Interchange Improvement Project Recirculated Draft EIR_EA
Final EIR_EA – July 2005
0.0 Cover
0.1 Signature Sheet
0.2 Draft FONSI
0.3 Table of Contents
0.4 Executive Summary
1.0 Introduction
2.0 Preferred Alternative
3.0 Response to Comments
4.0 Errata
5.0 Mitigation Monitoring and Reporting Program
6.0 Additional Federal Information
7.0 Preparers
Appendix I - Roadway Construction Air Quality Model
Complete Sheldon Road_SR 99 Interchange Improvement Project Final EIR_EA
CEQA Notice of Determination – July 2005
NEPA Finding of No Significant Impact - November 2006
Resource Agency Documents and Permits
Biological Opinion
Biological Opinion Issued for Sheldon Road_SR 99 Interchange Project – July 20, 2006
CDFG Concurrence with Giant Garter Snake Incidental Take Statement – October 20, 2007
404 Permit – May 8, 2007
1602 Streambed Alteration Agreement – May 24, 2006
401 Water Quality Certification – July 24, 2006